96: Review Not Performed

Node Review Not Performed

Definition/Typical Issues

Was there a failure to perform a readiness review? Was a readiness review designated but not performed?


Examples

Example 1

  • A control valve failed to the wrong position upon loss of instrument air. A pre-startup safety review was not performed because the valve was installed as part of a replacement-in-kind.

Example 2

  • A mechanic failed to install an audio alarm in the waste treatment area. No readiness review was performed and the error was not detected.

Typical Recommendations

  • Conduct a readiness review for new or modified facilities, and ensure that all requirements of the review have been met before starting the process.
  • Determine the types of readiness reviews that are needed and when to conduct them.
  • Determine the areas of the facility where the readiness review procedure applies. Identify areas/situations where it does not apply.
  • Define the readiness review roles and responsibilities of various types of company/facility personnel.
  • Provide training on the readiness review system to employees and contractors.
  • Provide detailed training to personnel who are assigned specific roles within the readiness review system.

Cross-References

Version 10 Element(s)
Node ID Node Name
74 Review LTA or Not Performed
Back to top